<?xml version="1.0" encoding="UTF-8"?>
<!-- generator="FeedCreator 1.7.3" -->
<rdf:RDF
	xmlns="http://purl.org/rss/1.0/"
	xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:dc="http://purl.org/dc/elements/1.1/">
	<channel rdf:about="http://www.umatilla-cmp.org/">
		<title>UMCDF Comprehensive Monitoring Program</title>
		<description>CMP Status Updates</description>
		<link>http://www.umatilla-cmp.org/</link>
		<image rdf:resource="http://www.umatilla-cmp.org/images/M_images/cmpstatus.gif" />
	   <dc:date>2010-09-05T23:36:51+00:00</dc:date>
		<items>
			<rdf:Seq>
				<rdf:li rdf:resource="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=58:07-19-10status&amp;amp;Itemid=41"/>
				<rdf:li rdf:resource="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=57:04-27-10status&amp;amp;Itemid=41"/>
				<rdf:li rdf:resource="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=56:01-18-10status&amp;amp;Itemid=41"/>
				<rdf:li rdf:resource="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=55:10-30-09status&amp;amp;Itemid=41"/>
				<rdf:li rdf:resource="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=54:8-28-09status&amp;amp;Itemid=41"/>
			</rdf:Seq>
		</items>
	</channel>
	<image rdf:about="http://www.umatilla-cmp.org/images/M_images/cmpstatus.gif">
		<title>UMCDF Comprehensive Monitoring Program</title>
		<link>http://www.umatilla-cmp.org/</link>
		<url>http://www.umatilla-cmp.org/images/M_images/cmpstatus.gif</url>
	</image>
	<item rdf:about="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=58:07-19-10status&amp;amp;Itemid=41">
		<dc:format>text/html</dc:format>
		<dc:date>2010-07-19T15:00:00+00:00</dc:date>
		<dc:source>http://www.umatilla-cmp.org/</dc:source>
		<dc:creator>Administrator</dc:creator>
		<title>19 July 2010</title>
		<link>http://www.umatilla-cmp.org/index.php?option=com_content&amp;view=article&amp;id=58:07-19-10status&amp;Itemid=41</link>
		<description>&lt;p&gt;This update describes the status of the CMP as of July, 2010.  In summary, the April 2010 Quarterly Report has been posted, field sampling was completed for the July 2010 event on July 17, 2010, and laboratory analysis is ongoing for this event.  The July 2010 Sampling Event was the 24th operational event and the 46th quarterly event overall. &lt;/p&gt;&lt;h3 style=&quot;font-family: Helvetica, Arial, sans-serif; color: #135cae; font-size: 13px; font-weight: bold&quot;&gt;Field&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Field sampling began July 12, 2010 and ended July 17, 2010.  The next sampling event is tentatively scheduled to commence in early-Oct, 2010.&lt;/p&gt;&lt;h3 style=&quot;font-family: Helvetica, Arial, sans-serif; color: #135cae; font-size: 13px; font-weight: bold&quot;&gt;Laboratory Analysis&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Analysis is ongoing for the July, 2010 samples.&lt;/p&gt;&lt;h3 style=&quot;font-family: Helvetica, Arial, sans-serif; color: #135cae; font-size: 13px; font-weight: bold&quot;&gt;Perimeter Monitoring Network&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;PMN air sampling has ended for the July, 2010 Sampling Event and validated results will be reported in the July Quarterly Report.&lt;/p&gt;&lt;p&gt;PMN air sampling for the October, 2010 Sampling Event has commenced.&lt;/p&gt;&lt;h3 style=&quot;font-family: Helvetica, Arial, sans-serif; color: #135cae; font-size: 13px; font-weight: bold&quot;&gt;Data Validation&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;PMN air data packages for the July, 2010 Sampling Event are being prepared for validation.&lt;/p&gt;&lt;p&gt;Data packages with the July, 2010 non-air sample results will be validated after analysis is complete.&lt;/p&gt;&lt;h3 style=&quot;font-family: Helvetica, Arial, sans-serif; color: #135cae; font-size: 13px; font-weight: bold&quot;&gt;Reports Under Preparation&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;The July, 2010 Quarterly Report will be prepared once validation is completed.&lt;/p&gt;&lt;h3 style=&quot;font-family: Helvetica, Arial, sans-serif; color: #135cae; font-size: 13px; font-weight: bold&quot;&gt;Reports Submitted to Oregon Department of Environmental Quality.&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;The April, 2010 Quarterly Report was submitted to the DEQ in early July, 2010.&lt;/p&gt;&lt;h3 style=&quot;font-family: Helvetica, Arial, sans-serif; color: #135cae; font-size: 13px; font-weight: bold&quot;&gt;Public Presentations&lt;br /&gt;&lt;/h3&gt;There have been no new public presentations.</description>
	</item>
	<item rdf:about="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=57:04-27-10status&amp;amp;Itemid=41">
		<dc:format>text/html</dc:format>
		<dc:date>2010-04-27T15:00:00+00:00</dc:date>
		<dc:source>http://www.umatilla-cmp.org/</dc:source>
		<dc:creator>Administrator</dc:creator>
		<title>27 April 2010</title>
		<link>http://www.umatilla-cmp.org/index.php?option=com_content&amp;view=article&amp;id=57:04-27-10status&amp;Itemid=41</link>
		<description>&lt;p&gt;This update describes the status of the CMP as of April, 2010.  In summary, the January 2010 Quarterly Report has been posted, field sampling was completed for the April 2010 event on April 8, 2010, and laboratory analysis is ongoing for this event.  The April 2010 Sampling Event was the 23rd operational event and the 45th quarterly event overall. &lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Field&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Field sampling began April 5, 2010 and ended April 8, 2010.  The next sampling event is tentatively scheduled to commence in mid-July, 2010.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Laboratory Analysis&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Analysis is ongoing for the April, 2010 samples.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Perimeter Monitoring Network&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;PMN air sampling has ended for the April, 2010 Sampling Event and validated results will be reported in the April Quarterly Report.&lt;/p&gt;&lt;p&gt;PMN air sampling for the July, 2010 Sampling Event has commenced.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Data Validation&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;PMN air data packages for the April, 2010 Sampling Event are being prepared for validation.&lt;/p&gt;&lt;p&gt;Data packages with the April, 2010 non-air sample results will be validated after analysis is complete.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Reports Under Preparation&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;The April, 2010 Quarterly Report will be prepared once validation is completed.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Reports Submitted to Oregon Department of Environmental Quality.&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;The January, 2010 Quarterly Report was submitted to the DEQ in early April, 2010.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Public Presentations&lt;br /&gt;&lt;/h3&gt;There have been no new public presentations.</description>
	</item>
	<item rdf:about="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=56:01-18-10status&amp;amp;Itemid=41">
		<dc:format>text/html</dc:format>
		<dc:date>2010-01-18T16:00:00+00:00</dc:date>
		<dc:source>http://www.umatilla-cmp.org/</dc:source>
		<dc:creator>Administrator</dc:creator>
		<title>18 January 2010</title>
		<link>http://www.umatilla-cmp.org/index.php?option=com_content&amp;view=article&amp;id=56:01-18-10status&amp;Itemid=41</link>
		<description>&lt;p&gt;This update describes the status of the CMP as of January 18, 2010.  In summary, the October 2009 Quarterly Report has been posted, field sampling was completed for the January 2010 event on January 15, 2010, and laboratory analysis is ongoing for this event.  The January 2010 sampling event was the 22nd operational event and the 44th quarterly event overall. &lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Field&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Field sampling began January 11, 2010 and ended January 15, 2010.  The next sampling event is tentatively scheduled to commence in mid-April, 2010.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Laboratory Analysis&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Analysis is ongoing for the January, 2010 samples.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Perimeter Monitoring Network&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;PMN air sampling has ended for the January, 2010 Sampling Event and validated results will be reported in the January Quarterly Report.&lt;/p&gt;&lt;p&gt;PMN air sampling for the April, 2010 sampling event has commenced.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Data Validation&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;PMN air data packages for the January, 2010 sampling event are being prepared for validation.&lt;/p&gt;&lt;p&gt;Data packages with the January, 2010 non-air sample results will be validated after analysis is complete.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Reports Under Preparation&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;The January, 2010 Quarterly Report will be prepared once validation is completed.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Reports Submitted to Oregon Department of Environmental Quality.&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;The October, 2009 Quarterly Report was submitted to the DEQ in early January, 2010.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Public Presentations&lt;br /&gt;&lt;/h3&gt;There have been no new public presentations.</description>
	</item>
	<item rdf:about="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=55:10-30-09status&amp;amp;Itemid=41">
		<dc:format>text/html</dc:format>
		<dc:date>2009-10-30T15:00:00+00:00</dc:date>
		<dc:source>http://www.umatilla-cmp.org/</dc:source>
		<dc:creator>Administrator</dc:creator>
		<title>30 October 2009</title>
		<link>http://www.umatilla-cmp.org/index.php?option=com_content&amp;view=article&amp;id=55:10-30-09status&amp;Itemid=41</link>
		<description>&lt;p&gt;This is update describes the status of the CMP as of October 30, 2009.  In summary, the July 2009 Quarterly Report has been posted, field sampling was completed for the October 2009 event on October 8, 2009 and laboratory analysis is ongoing for this event. &lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Field&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Field sampling began October 5, 2009 and ended October 8, 2009.  The next sampling event is tentatively scheduled to commence in mid-January, 2010.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Laboratory Analysis&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Analysis is ongoing for the October, 2009 samples.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Perimeter Monitoring Network&lt;br /&gt;&lt;/h3&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;PMN air sampling has ended for the October, 2009 Sampling Event and validated results will be reported in the October Quarterly Report.&lt;/li&gt;&lt;/ul&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;PMN air sampling for the January, 2010 sampling event has commenced.&lt;/li&gt;&lt;/ul&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Data Validation&lt;br /&gt;&lt;/h3&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;PMN air data packages for the October, 2009 sampling event are being prepared for validation.&lt;/li&gt;&lt;/ul&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;Data packages with the October, 2009 non-air sample results will be validated after analysis is complete.&lt;/li&gt;&lt;/ul&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Reports Under Preparation&lt;br /&gt;&lt;/h3&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;The October 2009 Quarterly Report will be prepared once validation is completed.&lt;/li&gt;&lt;/ul&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Reports Submitted to Oregon Department of Environmental Quality.&lt;br /&gt;&lt;/h3&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;The July 2009 Quarterly Report was submitted to the DEQ in early October, 2009.&lt;/li&gt;&lt;/ul&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Public Presentations&lt;br /&gt;&lt;/h3&gt;There have been no new public presentations.</description>
	</item>
	<item rdf:about="http://www.umatilla-cmp.org/index.php?option=com_content&amp;amp;view=article&amp;amp;id=54:8-28-09status&amp;amp;Itemid=41">
		<dc:format>text/html</dc:format>
		<dc:date>2009-08-28T15:00:00+00:00</dc:date>
		<dc:source>http://www.umatilla-cmp.org/</dc:source>
		<dc:creator>Administrator</dc:creator>
		<title>28 August 2009</title>
		<link>http://www.umatilla-cmp.org/index.php?option=com_content&amp;view=article&amp;id=54:8-28-09status&amp;Itemid=41</link>
		<description>&lt;p&gt;This update describes the status of the CMP as of August 28, 2009.  In summary, the July 2009 Quarterly Report will be posted, field sampling was completed for the July 2009 event on July 10, 2009 and laboratory analysis is complete as well as data validation for this event. &lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Field&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Field sampling began July 6, 2009 and ended July 10, 2009.  The next sampling event is tentatively scheduled to commence in mid-Oct, 2009.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Laboratory Analysis&lt;br /&gt;&lt;/h3&gt;&lt;p&gt;Analysis is complete for the July, 2009 samples.&lt;/p&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Perimeter Monitoring Network&lt;br /&gt;&lt;/h3&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;PMN air sampling has ended for the July, 2009 Sampling Event and validated results will be reported in the July Quarterly Report.&lt;/li&gt;&lt;/ul&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;PMN air sampling for the October, 2009 sampling event has commenced.&lt;/li&gt;&lt;/ul&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Data Validation&lt;br /&gt;&lt;/h3&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;PMN air data packages for the July, 2009 sampling event have been validated.&lt;/li&gt;&lt;/ul&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;Data packages with the July, 2009 non-air sample results have been analysed and validated.&lt;/li&gt;&lt;/ul&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Reports Under Preparation&lt;br /&gt;&lt;/h3&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;The July 2009 Quarterly Report will be prepared as validation is completed.&lt;/li&gt;&lt;/ul&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Reports Submitted to Oregon Department of Environmental Quality.&lt;br /&gt;&lt;/h3&gt;&lt;ul class=&quot;bullet-5&quot;&gt;&lt;li&gt;The April 2009 Quarterly Report was submitted to the DEQ in July, 2009.&lt;/li&gt;&lt;/ul&gt;&lt;h3 style=&quot;font-weight: bold; font-size: 13px; color: #135cae; font-family: Helvetica, Arial, sans-serif&quot;&gt;Public Presentations&lt;br /&gt;&lt;/h3&gt;There have been no new public presentations.</description>
	</item>
</rdf:RDF>
